40MW/160MWh Suger Baby cloth storage capacity! Hunan Hengyang Guangcai special-purpose business project bidding!|包養
requestId:68629ab43d66a3.56186565. 包養
Beijing Star Energy Network reported that on November 24, Hengyang City, Hunan Province issued a bid notice for two major luminous enterprises, namely the Hi-Tech Zone and the Pine Wood Opening Zone. There are 37 distributed energy storage stations, a scale-based 40MW/160MWh, and a 120kW DC charging and power supply 2603 platform is planned to be 女大生包養俱樂部 installed.
The total investment of the high-tech zone’s optical recharge projects is 2586.801 million yuan. The construction investment of the project is 120.405.11 million yuan, the special right price is 126.557 million yuan, and the construction period profit is 117.18 million yuan. The project plans to build a “light charging” system for building a controllable building, factory, school, guaranteed housing and other buildings and parking lots. The top surface of the photovoltaic power generation building building has a total area of 1.232 million square meters, and the distributed photovoltaic area of the public parking lot is 125,800 square meters. It adopts partitioned power generation and centralized network planning to divide the system into 80 photovoltaic power generation units, and the total installation scale of photovoltaic is 160MW. 32 new distributed energy storage stations have been built, with a total scale of 25MW/100MWh. The project plans to install a 120kW DC charging platform (dual gun fast charging) 1883 platform, which can meet the charging needs of 3766 vehicles.
The total investment of the Pine Wood Zone Loss Project is 1.48,034.95 million yuan, of which the construction investment is 720,586,200 yuan, and the special expense of the right to pay is 702,223,300 yuan, and the construction period profit is 57.54 million yuan. The project plans to apply the roofs and parking spaces of buildings such as factories, public rental housing, and trunk housing that can be controlled by the Hengyang Songmu District Management Committee to create a “light charging” integrated system. The building area of the roof photovoltaic power generation on the project has a building area of 398,407.17㎡, and the distributed photovoltaic area of the attached parking lot is 247,758.00㎡. It adopts partitioned power generation and centralized network planning. The total capacity of the photovoltaic power station is 110MW and the annual power generation capacity is 95.2198 million degrees. The newly built energy storage capacity is designed at 15% of the photovoltaic design capacity, and 5 distributed energy storage stations are set up in the project, with a combined scale of 15MW/60MWh. The building is equipped with parking lots and public parking lots. This project plans to install 720 120kW DC charging rods (dual gun fast charging) .
The original text of the challenge is as follows
Hengyang High-tech Zone 包養網dcard Lighting Charge Special Business Project Tender Notice
1. 包養網評價 Tender conditions
This bidding project Hengyang High-tech Zone Lighting Charge Special Business Project (Ask her when she remembered that there was a pet rescue station nearby, so she turned out to the name of the community with her cat) has been approved by the Hengyang Municipal National People’s Administration (the name of the project review, verification or preparation machine) with the approval of Hengyang Municipal National 包養網ppt People’s Administration for the approval of Hengyang Municipal High-tech Zone Lighting Charge <Hengyang Municipal High-tech Zone Lighting Charge The approval of the implementation plan for the project for special management is approved by the approving the construction (Hengzheng Letter [2023] No. 32) (approval name and number) agreed to the construction, and the construction funds come from the full amount of funds (the source of funds), and the project investment ratio is 100%, and the bidder is For the Hengyang Municipal Development and Reform Commission. The project has already established bidding conditions and is now open for the project's special bidding.
2. Project overview and bidding 甜心網 scope
2.1 Project overview: Total investment in this project It is RMB 2586.801 million, and the construction investment of the project is RMB 1204.051 million, and 包養故事 the special right price is RMB 1265.57 million, and the construction period profit is RMB 117.18 million.
The project plans to build a “optical charging” system for building a controllable building, factory, school, guaranteed housing and other buildings and parking lots. The project is mainly composed of photovoltaic (photovoltaic power generation system), storage (energy storage 長期包養 equipment), charging (energy storage (energy storage equipment) and charging (energy charging). (1)Photovoltaic power generation system
The top surface of the photovoltaic power generation building building has a total area of 1.232 million square meters, and the distributed photovoltaic area of the public parking lot is 125,800 square meters. It adopts partitioned power generation and centralized network planning to divide the system into 80 photovoltaic power generation units, and the total installation scale of photovoltaic is 160MW.
(2) Energy storage system
32 new distributed energy storage stations are built, with a comprehensive scale is expected to be 25MW/100MWh.
(3) Charging Map
The project plans to install a 120kW DC charging 包養一個月價錢 Map (double-gun fast charging) 1883 platform, which can meet the charging needs of 3766 vehicles.
2.2 Special scope of operation:
This project specifically refers to the rooftops and parking spaces of buildings such as building, factory, school, guaranteed housing, etc. that can be controlled by the Hengyang High-tech Zone Management Committee. The size of the roof and parking space resources provided by the District Administration Committee is limited to the number agreed in the business agreement.
2.3 包養網dcard Business content:
This project company enjoys 包養網 the above-mentioned business scope during the business period. Planning, design, investment and financing, construction and operation maintenance rights of internal light storage facilities.
2.4 Special operation period: The special operation date of this project (including the construction period and operation period) is set to 30 years, and is signed from the “Special Operation Agreement” of this projectCalculate from the date of reservation. The 包養網推薦 construction period is 2 years. From the date of the special operation agreement to the date of completion and acceptance of all optical equipment facilities, the overall operation period is 29 years (the operation period and the construction period are re-issued for 1 year), from the date of the first batch of equipment being put into use to the date of the end of the special operation cooperation period.
Projects can be built 包養網評價 in batches during the construction period. 長期包養 Each facility will be inspected 女大生包養俱樂部 and collected immediately after the construction of each facility is completed. After the inspection and acquisition trial is passed, the operator is specially allowed to sign a power management contract with the power unit, sign a power sales contract with the Internet company, and ‘s online adjustment agreement and operate online.
2.5 Reporting mechanism: The report mechanism of this project is “applicant pays”, which does not 包養站長 involve the feasibility gap of the authorities, and does not increase the authorities’ financial income. During the operation period, the project company specializes in operating distributed photovoltaic power generation facilities, energy storage facilities and charging ports within the operation scope, supplying power to power users and Internet companies, and charging fees; charging fees for new power vehicles.
2.6 Special Rights Grant 包養故事 Method:
This project claims that the right to be granted is subject to probable grant, and the winning operators must pay the right to pay for the right to be paid. It is said that the fee base price will be determined by the Hengyang Municipal Development and Reform Commission’s entrusted asset evaluation agency. The bidder requests to report the bid according to the bid documents. The bidding quote of the winning unit is the project’s special account and the right to pay.
Project companies must pay the right to pay the right to the Hengyang Municipal Financial Bureau according to the winning price. It is possible that the fee can be deposited in three installments. The first payment shall be paid within 30 days after the signing of the Investment Agreement, the first payment shall not be less than 30% of all payments; the second payment shall be paid within 365 days (1 year) after the signing of the Investment Agreement shall not be less than 60% of all payments; the third payment shall be paid within 730 days (2 years) after the signing of the Investment Agreement.
During the operation period, the price will not be adjusted for the special rights. The scale of roof and parking resources provided by 包養app the Hi-Tech Zone Management Committee is limited to the number agreed by the Protected Operations Agreement.
2.7 Project Operation Method:
(1) The High-tech Zone Management Committee entrusts the Municipal Development and Reform Commission as the implementation agency of this project, responsible for the relevant tasks granted by the special authority of this 包養網車馬費 project, as well as supervision 包養網 and governance in the implementation operatio TC:
